Cement Sand And Stone Calculator

Instantly calculate cubic yards, bags of 80‑lb mix, and cubic feet for your cement, sand, and stone project – free and no sign‑up

  • Free
  • No sign-up
  • Instant results

Loading calculator…

How to use it

  1. Enter length in feet
  2. Enter width in feet
  3. Enter thickness in inches and hit Calculate

What it does – The calculator converts the length, width, and thickness you enter into three useful measures: cubic yards of material, the number of 80‑lb bags of ready‑mix needed, and the total cubic feet. Knowing the cubic yards helps you order the right amount of cement, sand, and stone from the supplier, while the bag count tells you how many bags of pre‑mixed concrete to buy. The cubic‑feet figure is handy for estimating fill for trenches or footings. No guesswork, just clear numbers you can put directly into your project plan. Because the bag yield is fixed at 0.6 ft³ per 80‑lb bag, the results are reliable for standard mixes. You can also compare different thicknesses to see how material needs grow, making budgeting faster and more accurate.

Pro tips

  • Add a 10 % waste allowance to the bag total
  • Round up the bag count to the next whole bag
  • Order a little extra to cover settling after placement
  • Double‑check that thickness is entered in inches, not feet

Real-life examples

  • Homeowner pouring a 4‑ft by 8‑ft patio slab 4 in thick
  • Contractor estimating material for a 10‑ft wide driveway base 6 in thick
  • Landscaper filling a raised garden bed 3 ft long, 2 ft wide, 5 in deep

Case study

Mike needed a 6 × 10 ft patio 4 in thick. Using the calculator he saw he required 0.89 cubic yards, which translated to 5 bags of 80‑lb mix. He ordered 6 bags, avoided a shortfall, and completed the patio on schedule.

Frequently asked questions

How do I convert thickness from inches to feet?
Divide the inches by 12; the calculator does this automatically.
Can I use the bag count for a different mix weight?
The bag count is based on 80‑lb bags; for other weights adjust using the 0.6 ft³ per bag ratio.
What if my project shape isn’t a perfect rectangle?
Break the area into rectangles, calculate each, then add the results.
Do I need to include a waste factor?
Yes, add about 10 % to the bag total to cover spillage and over‑fill.
Is the result in cubic yards or cubic feet?
Both are shown; cubic yards are for ordering bulk material, cubic feet for on‑site volume checks.