Footing Calculator

Calculate the concrete volume for your footing in cubic yards, bags, and cubic feet instantly and free.

  • Free
  • No sign-up
  • Instant results

Loading calculator…

How to use it

  1. Enter length in feet
  2. Enter width in feet
  3. Enter thickness in inches
  4. Read cubic feet, cubic yards, and bag count results

The Footing Calculator converts the dimensions of a concrete footing into three useful measures: cubic feet, cubic yards, and the number of 80‑lb bags needed. Knowing the exact volume helps you order the right amount of mix, avoid costly over‑orders, and keep your project on schedule. You enter length and width in feet and thickness in inches; the tool first turns thickness into feet, multiplies length × width × thickness to get cubic feet, divides by 27 for cubic yards, and divides cubic feet by 0.6 to estimate bags. For example, a 10 ft × 5 ft footing that is 6 in thick equals 25 ft³, about 0.93 yd³, and requires roughly 42 bags. Add a 5‑10% contingency to cover spillage and compaction. The calculator updates instantly as you tweak dimensions, so you can experiment with different footing sizes without manual math.

Pro tips

  • Include a 5‑10% waste factor when ordering bags.
  • Round up bag count to the nearest whole bag.
  • Order an extra bag for unexpected mix variations.
  • Double‑check that thickness is entered in inches, not feet.

Real-life examples

  • A homeowner planning a new patio footings.
  • A contractor estimating material for a residential foundation.
  • A DIY landscaper building a retaining wall base.

Case study

Mike needed a 12 ft × 8 ft footing 8 in thick for his garage. Using the calculator he saw he required 42 ft³ (≈1.6 yd³) and 70 bags, preventing a $300 over‑order.

Frequently asked questions

How do I convert thickness from inches to feet?
Divide the inches by 12; the calculator does it automatically.
Why is the result shown in cubic yards?
Cubic yards are the standard unit for ordering bulk concrete.
How many bags equal one cubic yard?
One 80‑lb bag yields about 0.6 cubic feet, so roughly 50 bags make a cubic yard.
Should I round up the bag count?
Yes, always round up to the next whole bag to ensure enough mix.
What waste allowance is recommended?
Add 5‑10% extra material to cover spillage, compaction, and minor errors.