Monolithic Slab Calculator

This free monolithic slab calculator instantly estimates concrete in cubic yards, bags, and cubic feet for your foundation.

  • Free
  • No sign-up
  • Instant results

Loading calculator…

How to use it

  1. Enter the slab length in feet.
  2. Enter the slab width in feet.
  3. Enter the slab thickness in inches.
  4. Click Calculate to see cubic yards, cubic feet, and 80-lb bag count.

This monolithic slab calculator tells you exactly how much concrete you need for a one-pour slab foundation. It converts your length, width, and thickness into the three numbers that matter: cubic yards for ordering ready-mix, cubic feet for volume reference, and bags if you're mixing by hand. The bag count is based on a standard 80-lb bag yielding about 0.6 cubic feet, so you can plan a job of any size. Why does this matter? Ordering too little means a cold joint or a second delivery with extra labor costs. Ordering too much wastes money and creates disposal headaches. The output makes it easy to compare ready-mix vs. bagged concrete, talk confidently with suppliers, and budget accurately. Whether you're building a shed pad, garage floor, or small home foundation, this gives you a clear starting point before you break ground.

Pro tips

  • Add 10% waste for spillage, uneven subgrade, and slight over-excavation — especially on monolithic pours.
  • Round bag counts up to the next whole bag; you can't order a fraction of a bag.
  • For large slabs, compare bag costs against a ready-mix delivery — buying 80-lb bags gets expensive fast when you pass 1 cubic yard.
  • Don't forget to verify your thickness in inches matches the actual form depth; a common mistake is measuring the form height but ignoring the gravel base.
  • Use the same units throughout — mixing feet and inches in the same field throws off the result.

Real-life examples

  • A homeowner sizing a 10x12 shed slab needs to know how many 80-lb bags to buy.
  • A contractor estimating a 30x40 garage foundation wants cubic yards for a ready-mix order.
  • A DIYer comparing bagged concrete vs. truck delivery for a 20x24 monolithic slab.

Case study

Before, Mark estimated his 12x16 shed slab by guessing and bought 45 bags — 12 too many, wasting $90. After using this calculator, he entered 12, 16, and 4 inches. It showed 2.37 cubic yards and 107 bags. He ordered a ready-mix truck instead and saved time and money.

Frequently asked questions

How many 80-lb bags of concrete do I need for a monolithic slab?
Divide your total cubic feet by 0.6, then round up. For example, 100 cubic feet needs 167 bags. Always add 10% for waste.
What is the difference between cubic yards and cubic feet?
Cubic yards is the standard unit for ready-mix orders; cubic feet is the raw volume. There are 27 cubic feet in 1 cubic yard.
How thick should a monolithic slab be?
Typical residential slabs are 4 to 6 inches thick, depending on soil, load, and local code. Your engineer or building department sets the final number.
Should I order ready-mix or bagged concrete for my slab?
If you need more than about 1 cubic yard, ready-mix is usually more cost-effective and consistent. Bagged works for small pads under roughly 50 bags.
Can I use this calculator for a slab with footings?
No — a monolithic slab includes the slab and thickened edge footings in one pour. This calculator only measures the uniform slab area, so add footing volume separately.